Completed Projects

connecting into mh2-64.JPG

Shore Road Main Replacement

 

In 2017 the District replaced

approximately 2,500 feet of

aging 10" Clay main and 15

manholes in Shore Road.

Pumping Station 5 Upgrade

 

The Pumping station located

on Route 1 at Philips Bridge

was upgraded summer of

2018. The upgrade included

the replacement of electrical

controls and panels and the

addition of an automatic

generator to help reduce risk

during power outages.